Critical Chain Management: Unlock Project Success!

Critical chain management, a potent methodology, significantly improves project execution. Goldratt’s Theory of Constraints *underpins* its core principles, focusing on identifying and mitigating the most critical resource across the project network. Project management software like *Asana* increasingly incorporates features that support critical chain scheduling. Successful implementation often hinges on a project manager’s adeptness in resource allocation, a skillset taught by the *Project Management Institute*.

Project management, a discipline vital for orchestrating complex endeavors, often encounters familiar roadblocks. Delays, cost overruns, and resource conflicts plague projects across industries, underscoring the need for innovative approaches.

Traditional methods, while providing a structured framework, sometimes fall short in addressing the inherent uncertainties and human behaviors that influence project timelines and outcomes.

Enter Critical Chain Management (CCM), a paradigm shift that challenges conventional wisdom and offers a more realistic and effective path to project success. CCM isn’t just another project management tool; it’s a philosophy, a methodology, and a set of techniques designed to address the root causes of project delays and inefficiencies.

Table of Contents

The Pitfalls of Traditional Project Management

Traditional project management methodologies, such as the Critical Path Method (CPM), often rely on overly optimistic estimates and fail to account for human factors that significantly impact project execution.

Tasks are often padded with safety time to account for potential delays or unforeseen circumstances. While seemingly prudent, this practice can lead to:

  • Student Syndrome: The tendency to delay starting a task until the last possible moment, eroding the intended safety margin.

  • Parkinson’s Law: Work expands to fill the time available, meaning tasks take longer than necessary if excessive time is allocated.

Furthermore, resource contention is a common problem. When multiple projects compete for the same resources, delays cascade, impacting overall project timelines. Traditional project management often struggles to effectively address these resource dependencies.

Critical Chain Management: A New Paradigm

Critical Chain Management (CCM) offers a refreshing perspective. It’s rooted in the Theory of Constraints (TOC), a management philosophy that emphasizes identifying and managing the most significant constraint that hinders a system’s performance.

Instead of focusing on individual task durations, CCM concentrates on the flow of work and strategically places buffers to protect the project’s critical path – the "Critical Chain."

CCM acknowledges that projects are inherently uncertain. Instead of trying to eliminate uncertainty, it embraces it and builds in mechanisms to mitigate its impact. It challenges the traditional assumptions about project planning and execution.

Purpose and Scope

This editorial aims to provide a comprehensive understanding of Critical Chain Management.

It delves into the core principles, explores its benefits, and offers practical guidance on implementation. The goal is to equip you with the knowledge and insights necessary to determine if CCM is the right approach for your projects and to successfully adopt it within your organization.

Project management, a discipline vital for orchestrating complex endeavors, often encounters familiar roadblocks. Delays, cost overruns, and resource conflicts plague projects across industries, underscoring the need for innovative approaches.

Traditional methods, while providing a structured framework, sometimes fall short in addressing the inherent uncertainties and human behaviors that influence project timelines and outcomes.

Enter Critical Chain Management (CCM), a paradigm shift that challenges conventional wisdom and offers a more realistic and effective path to project success. CCM isn’t just another project management tool; it’s a philosophy, a methodology, and a set of techniques designed to address the root causes of project delays and inefficiencies.

The Pitfalls of Traditional Project Management

Traditional project management methodologies, such as the Critical Path Method (CPM), often rely on overly optimistic estimates and fail to account for human factors that significantly impact project execution.

Tasks are often padded with safety time to account for potential delays or unforeseen circumstances. While seemingly prudent, this practice can lead to:

Student Syndrome: The tendency to delay starting a task until the last possible moment, eroding the intended safety margin.

Parkinson’s Law: Work expands to fill the time available, meaning tasks take longer than necessary if excessive time is allocated.

Furthermore, resource contention is a common problem. When multiple projects compete for the same resources, delays cascade, impacting overall project timelines. Traditional project management often struggles to effectively address these resource dependencies.

Critical Chain Management: A New Paradigm

Critical Chain Management (CCM) offers a refreshing perspective. It’s rooted in the Theory of Constraints (TOC), which provides the theoretical foundation for understanding and addressing the inherent limitations that hinder project success. But before we dive deeper into the specifics of CCM, it’s essential to understand its theoretical bedrock: the Theory of Constraints.

The Theoretical Backbone: Understanding the Theory of Constraints (TOC)

The Theory of Constraints (TOC) isn’t just an academic concept; it’s a powerful management philosophy that emphasizes the importance of identifying and managing constraints within a system to achieve optimal performance. It’s the intellectual ancestor of Critical Chain Management, providing the core principles that guide CCM’s approach to project execution.

Defining the Theory of Constraints

At its core, the Theory of Constraints posits that every system, including a project, has at least one constraint that limits its ability to achieve its goal. This constraint can be anything from a physical resource to a policy or even a mindset.

TOC provides a focused methodology for improving organizational performance by:

  • Identifying the most significant constraint.
  • Exploiting the constraint – making the most of its current capacity.
  • Subordinating everything else to the exploitation decision.
  • Elevating the constraint – taking actions to eliminate the constraint.
  • Preventing inertia from setting in by continuously repeating the process.

These five focusing steps highlight TOC’s iterative nature, emphasizing that improvement is an ongoing journey rather than a one-time fix.

TOC’s Application to Project Management

In the context of project management, TOC provides a framework for identifying and addressing the constraints that are most significantly impacting project timelines and outcomes. These constraints might include:

  • Resource limitations: A critical piece of equipment or a highly skilled individual that is in short supply.
  • Policy constraints: Internal rules or procedures that hinder efficient project execution.
  • Multitasking: When team members are burdened with too many concurrent tasks.
  • Dependencies: Tasks that are reliant on one another.

By focusing on these constraints, project managers can make more informed decisions about resource allocation, task prioritization, and risk mitigation.

The Importance of Identifying and Addressing Project Constraints

Identifying and addressing project constraints is not merely a beneficial practice; it’s absolutely crucial for successful project execution. By understanding the limitations that are holding a project back, project managers can take targeted action to alleviate those limitations and improve overall project performance.

Failing to identify and address constraints can lead to:

  • Bottlenecks: Where work piles up, leading to delays and inefficiencies.
  • Missed deadlines: When critical tasks are delayed due to resource limitations or other constraints.
  • Increased costs: As projects take longer and require more resources than initially planned.
  • Reduced quality: When team members are forced to rush tasks in order to meet deadlines.

By actively managing constraints, project managers can unlock the full potential of their teams and resources, delivering projects on time, within budget, and to the required level of quality. Ultimately, TOC provides the strategic lens through which CCM views project management challenges, setting the stage for more effective and efficient project execution.

Core Concepts: Diving Deep into Critical Chain Management

Having laid the groundwork with the Theory of Constraints, it’s time to explore the core components that make Critical Chain Management a distinct and powerful methodology. CCM introduces concepts that challenge conventional thinking and provide a more robust approach to project execution.

Critical Chain vs. Critical Path: A Fundamental Distinction

At the heart of CCM lies the Critical Chain, often confused with the traditional Critical Path. While both methods aim to identify the longest sequence of dependent tasks, their approaches differ significantly.

The Critical Path, used in CPM, focuses solely on task dependencies. It determines the longest path based on estimated task durations, often padded with safety time.

The Critical Chain, however, goes a step further. It considers both task dependencies and resource constraints. This means identifying the longest sequence of dependent tasks that also accounts for resource availability.

In essence, the Critical Chain acknowledges that projects often face bottlenecks due to limited resources. By incorporating these constraints into the schedule, CCM provides a more realistic and achievable project plan.

Buffers: Strategic Protection Against Uncertainty

CCM strategically employs buffers to protect the project schedule from disruptions. These buffers are strategically placed time reserves designed to absorb variability and prevent delays from cascading through the project. There are three main types of buffers in CCM:

Project Buffers, Feeding Buffers, and Resource Buffers.

Project Buffer: Shielding the Finish Line

The Project Buffer is strategically placed at the end of the Critical Chain. It acts as a shield, absorbing any delays that occur along the critical path.

This buffer protects the project’s overall completion date, ensuring that unforeseen issues don’t derail the entire endeavor. The size of the Project Buffer is typically determined by aggregating the safety time removed from individual tasks.

Feeding Buffers: Safeguarding the Critical Chain

Feeding Buffers are inserted at the points where non-critical chains merge into the Critical Chain. These buffers protect the Critical Chain from delays originating in non-critical tasks.

If a task feeding into the Critical Chain is delayed, the Feeding Buffer absorbs the delay, preventing it from impacting the critical path and the overall project timeline.

Resource Buffers: Ensuring Availability

Resource Buffers are alerts placed before tasks on the Critical Chain that require specific resources. These buffers are not time-based.

Instead, they serve as early warnings to ensure that resources are available when needed. This proactive approach helps prevent resource bottlenecks and keeps the Critical Chain flowing smoothly.

Addressing Common Project Management Issues with CCM

CCM directly confronts common human behaviors that often sabotage project timelines: Student Syndrome, Parkinson’s Law, and Multitasking.

Combating Student Syndrome

Student Syndrome, the tendency to delay starting a task until the last minute, is a widespread problem. CCM addresses this by removing the safety time from individual tasks and aggregating it into buffers.

Knowing that there’s a Project Buffer to absorb potential delays, team members are encouraged to start tasks promptly, rather than procrastinating. Regular monitoring of the buffers also provides early warnings if tasks are indeed being delayed.

Mitigating Parkinson’s Law

Parkinson’s Law states that work expands to fill the time available. In traditional project management, this leads to inflated task durations and inefficient resource utilization.

CCM counters this by encouraging aggressive, yet realistic, task estimates. With safety time removed, team members are motivated to complete tasks efficiently. The focus shifts from filling the allocated time to delivering results quickly.

Minimizing the Impact of Multitasking

Multitasking, the practice of working on multiple tasks simultaneously, is often seen as a way to increase productivity. However, research shows that multitasking actually reduces efficiency and increases errors.

CCM discourages multitasking by prioritizing tasks on the Critical Chain. By focusing on completing one task at a time, team members can avoid the cognitive overload associated with multitasking and improve their overall performance. Resource buffers also help reduce multitasking, as resources are alerted to their next assignment in advance.

Having established the importance of buffers and how they protect against variability, understanding how Critical Chain Management handles resource allocation is crucial. Unlike traditional methods that often lead to inefficiencies, CCM prioritizes streamlined resource utilization to keep projects on track.

Resource Management in CCM: Dependencies and Optimization

Handling Resource Dependencies in CCM

Critical Chain Management fundamentally alters how resource dependencies are viewed and managed. Traditional project management often struggles with resource contention, leading to delays and bottlenecks. CCM proactively addresses these issues.

Instead of blindly assigning resources based on task estimates, CCM acknowledges that resources are often shared across multiple tasks and projects. It prioritizes the tasks on the Critical Chain, ensuring they have access to the necessary resources when needed.

This prioritization helps to prevent delays caused by resource unavailability, a common problem in traditional project management. The Critical Chain acts as a guide, ensuring that resources are focused on the most crucial tasks.

Optimizing Resource Allocation Within the CCM Framework

CCM employs several strategies to optimize resource allocation. One key element is the identification and removal of "multitasking".

Multitasking, where resources are simultaneously working on multiple tasks, is a major source of inefficiency. CCM actively discourages multitasking, promoting focused effort on a single task at a time.

Another strategy is to clearly define resource priorities. By establishing a clear hierarchy of tasks, CCM ensures that resources are allocated to the most critical activities first.

This eliminates confusion and prevents resources from being diverted to less important tasks. It also leverages resource buffers, strategically placed to ensure resource availability just before a critical task is set to begin.

CCM vs. Traditional Resource Leveling: A Key Difference

Traditional resource leveling aims to smooth out resource allocation across the entire project, preventing overallocation and ensuring resources are evenly utilized. While this approach seems logical, it can inadvertently extend the project timeline and mask critical dependencies.

CCM, on the other hand, prioritizes the Critical Chain. Resource leveling is still considered, but it’s performed within the context of the Critical Chain. The goal is not simply to even out resource utilization, but to ensure that the Critical Chain is not delayed due to resource constraints.

This fundamental difference in approach leads to significantly different outcomes. CCM focuses on completing the project as quickly as possible, even if it means temporarily uneven resource utilization. Traditional resource leveling, in contrast, may prioritize even utilization at the expense of project speed.

Furthermore, CCM minimizes the need for extensive resource leveling by proactively managing resource dependencies and preventing multitasking. By focusing on the Critical Chain and strategically placing buffers, CCM creates a more robust and efficient project plan that minimizes the impact of resource constraints.

Having established the importance of buffers and how they protect against variability, understanding how Critical Chain Management handles resource allocation is crucial. Unlike traditional methods that often lead to inefficiencies, CCM prioritizes streamlined resource utilization to keep projects on track. The next logical step is to understand where CCM fits within the broader project management landscape, particularly in relation to the well-established Critical Path Method (CPM).

vs. CPM: A Comparative Analysis

Critical Chain Management (CCM) and the Critical Path Method (CPM) represent distinct approaches to project scheduling and management. While both aim to optimize project timelines, their underlying philosophies and methodologies differ significantly. Understanding these differences is key to selecting the most appropriate method for a given project.

Philosophical and Methodological Divergences

CPM, a cornerstone of traditional project management, focuses on identifying the longest sequence of activities (the critical path) that determines the shortest possible project duration. It relies on accurate activity time estimates and assumes that activities will be executed as planned.

CCM, on the other hand, acknowledges the inherent uncertainty and variability in project execution. It incorporates buffers to protect the project schedule from delays caused by individual task overruns or resource constraints.

The core differences lie in how each method handles uncertainty, resource management, and human behavior.

Uncertainty and Variability

CPM treats activity durations as fixed or uses statistical averages, neglecting the impact of Student Syndrome and Parkinson’s Law.

CCM explicitly addresses these behavioral tendencies by encouraging aggressive task estimates and incorporating buffers to absorb potential delays.

This makes CCM more resilient to unforeseen challenges.

Resource Management and Dependencies

CPM focuses primarily on scheduling activities and does not explicitly optimize resource allocation.

CCM, however, places significant emphasis on resource dependencies and seeks to minimize multitasking to improve resource utilization.

By prioritizing resource allocation for tasks on the Critical Chain, CCM aims to prevent resource bottlenecks and ensure that critical activities are completed on time.

Human Behavior

CPM’s reliance on fixed estimates often leads to inflated timelines and inefficient resource utilization due to the Student Syndrome (procrastination) and Parkinson’s Law (work expanding to fill the available time).

CCM aims to mitigate these behaviors by encouraging aggressive estimates and using buffers to absorb potential delays, creating a more realistic and efficient project schedule.

Scenarios: When to Use CCM vs. CPM

The choice between CCM and CPM depends largely on the characteristics of the project and the organizational context.

When CPM is Suitable

CPM may be more suitable for projects with:

  • Well-defined activities with relatively predictable durations.
  • Minimal resource constraints or dependencies.
  • A stable environment with limited uncertainty.
  • A strong culture of accountability where individuals are likely to meet deadlines.

When CCM is the Preferred Approach

CCM is generally preferred for projects with:

  • Significant uncertainty and potential for delays.
  • Complex resource dependencies and potential bottlenecks.
  • A history of projects running over schedule and budget.
  • An organizational culture where individuals tend to procrastinate or inflate task estimates.

Advantages and Disadvantages of Each Method

Feature Critical Path Method (CPM) Critical Chain Management (CCM)
Philosophy Focus on optimizing the sequence of activities. Focus on managing uncertainty and resource dependencies.
Uncertainty Assumes fixed or statistically averaged activity durations. Acknowledges and addresses uncertainty through buffers.
Resource Mgmt Does not explicitly optimize resource allocation. Prioritizes resource allocation for tasks on the Critical Chain.
Human Behavior Susceptible to Student Syndrome and Parkinson’s Law. Mitigates these behaviors through aggressive estimates and buffers.
Advantages Simpler to implement for projects with low uncertainty. More resilient to delays and resource constraints. Improves resource utilization and throughput.
Disadvantages Less effective in dynamic environments with high uncertainty. Requires a shift in organizational culture and project management practices.

Having navigated the theoretical landscape and understood the comparative advantages of Critical Chain Management, the question now shifts to practical application: How does one actually implement CCM within a project? This section serves as a step-by-step guide, outlining the key actions needed to adopt CCM and realize its benefits.

Implementation Guide: A Step-by-Step Approach to Adopting CCM

Implementing Critical Chain Management (CCM) requires a structured approach. It involves careful planning, analysis, and commitment. The following steps provide a framework for successfully adopting CCM within your organization and projects.

Step 1: Identifying the Critical Chain

The first, and arguably most crucial, step in implementing CCM is identifying the Critical Chain.

This isn’t merely the Critical Path from traditional CPM. Rather, it’s the longest sequence of resource-dependent tasks that directly impacts project completion.

Identifying Task Dependencies and Constraints

Begin by mapping all project activities, outlining their dependencies. Pay special attention to resource constraints.

Which tasks share resources? Which resources are in limited supply? Understanding these constraints is vital.

Unlike CPM, which focuses solely on logical task dependencies, CCM prioritizes resource bottlenecks. Tasks that compete for the same resources are linked in the Critical Chain.

Differentiating the Critical Chain from the Critical Path

Remember, the Critical Chain may include segments of the Critical Path.

However, it primarily emphasizes resource contention. This often results in a different, more realistic, project schedule.

Focusing on resource dependencies provides a more accurate picture of potential delays. It allows for proactive resource management.

Step 2: Strategically Adding Buffers to the Project Schedule

Once the Critical Chain is identified, the next step is to strategically insert buffers into the schedule. Buffers are time reserves designed to absorb variability and protect the project’s timeline.

Types of Buffers and Their Placement

CCM utilizes three main types of buffers: Project Buffers, Feeding Buffers, and Resource Buffers. Each serves a distinct purpose.

Project Buffers are placed at the end of the Critical Chain, protecting the overall project completion date. They absorb delays that accumulate along the Critical Chain.

Feeding Buffers are inserted at the points where non-critical chains feed into the Critical Chain. They safeguard the Critical Chain from delays in supporting tasks.

Resource Buffers are alerts placed before critical resources are needed. They ensure resource availability and prevent delays due to resource unavailability.

Buffer Sizing and Calculation

Determining the appropriate size for each buffer is crucial. Buffers that are too small will be ineffective. Buffers that are too large will waste time and resources.

A common approach is to aggregate safety time that’s been removed from individual task estimates and consolidate it into the buffers.

Another method involves analyzing historical project data. Look for patterns in task durations and variability. Statistical analysis can help determine appropriate buffer sizes.

Dynamic Buffer Management

Buffers are not static entities. Their size and placement should be re-evaluated throughout the project lifecycle.

As the project progresses, monitor buffer consumption. Adjust buffer sizes as needed based on actual performance and emerging risks.

Step 3: Monitoring and Managing the Project Schedule Using CCM Principles

Effective monitoring and management are essential for successful CCM implementation. It requires a shift in focus from individual task completion to overall project flow.

Utilizing Buffer Management Techniques

Buffer management is the cornerstone of CCM monitoring. Track the consumption of each buffer.

Early buffer depletion signals potential problems. This necessitates immediate investigation and corrective action.

Monitor buffer status regularly. Use visual tools, such as buffer burn charts, to track buffer consumption over time.

Prioritizing Tasks on the Critical Chain

Focus on ensuring the smooth flow of tasks along the Critical Chain.

Resource conflicts should be resolved in favor of Critical Chain tasks. Prioritize resources to prevent bottlenecks on the Critical Chain.

Adapting to Change and Uncertainty

CCM is designed to handle change and uncertainty.

Regularly assess project risks and their potential impact on the Critical Chain. Adjust buffers and resource allocations as needed to mitigate these risks.

Emphasize the Need for Buy-In and Support from Leadership

CCM implementation requires a significant shift in mindset and project management practices.

Leadership buy-in is essential for successful adoption. Champion CCM’s vision and its potential benefits to the organization.

Communicating the Benefits of CCM

Clearly communicate the benefits of CCM to all stakeholders.

Explain how it can lead to reduced project lead times, improved on-time delivery, and enhanced resource utilization.

Overcoming Resistance to Change

Expect resistance to change. Some team members may be hesitant to adopt new processes and methodologies.

Address concerns openly and provide training and support to help them adapt. Highlight successful CCM implementations within the organization or industry.

Fostering a Culture of Collaboration

CCM promotes a culture of collaboration and shared responsibility. Encourage team members to work together to identify and resolve issues proactively.

Break down silos and foster open communication. This facilitates a more efficient and effective project environment.

Having meticulously walked through the implementation process, it’s natural to wonder about the payoff. What tangible benefits can organizations expect to reap by adopting Critical Chain Management? The advantages extend far beyond simple scheduling tweaks, touching on fundamental improvements in project efficiency and overall business performance. This section delves into the rewards that await those who embrace CCM, quantifying its impact on crucial project metrics.

The Rewards: Unlocking the Benefits of Critical Chain Management

Critical Chain Management isn’t merely a theoretical exercise; it’s a practical methodology that yields significant, measurable improvements in project performance. By addressing the root causes of project delays and inefficiencies, CCM unlocks a range of benefits that positively impact the bottom line. These advantages include reduced lead times, improved on-time delivery, enhanced resource utilization, and increased project throughput.

Reduced Project Lead Times: Accelerating Time to Market

One of the most compelling advantages of CCM is its ability to significantly reduce project lead times. Traditional project management often suffers from inflated task estimates, driven by the desire to build in safety margins. These individual buffers, when aggregated across the entire project, lead to unnecessarily long schedules.

CCM addresses this issue by aggregating safety margins into strategically placed buffers. This allows project teams to focus on completing tasks as efficiently as possible, without the pressure of arbitrary deadlines.

The result is a faster, more streamlined project execution process that accelerates time to market and provides a competitive advantage. Shorter lead times translate directly into faster revenue recognition and increased market responsiveness.

Improved On-Time Delivery: Meeting Commitments with Confidence

Late project delivery is a persistent problem across industries, eroding customer trust and damaging reputations. CCM directly tackles this challenge by providing a more realistic and reliable project schedule.

By focusing on resource dependencies and strategically managing buffers, CCM minimizes the risk of unexpected delays. Project and feeding buffers act as shock absorbers, absorbing variations in task durations and preventing them from cascading into critical delays.

The emphasis on proactive monitoring and buffer management enables project managers to identify and address potential issues early on, ensuring projects stay on track and commitments are met with confidence. This, in turn, strengthens customer relationships and fosters a culture of reliability.

Enhanced Resource Utilization: Doing More with Less

Inefficient resource allocation is a major contributor to project delays and cost overruns. CCM optimizes resource utilization by prioritizing tasks on the Critical Chain and minimizing multitasking.

By focusing resources on the most critical activities, CCM ensures that valuable time and effort aren’t wasted on non-essential tasks. Resource buffers further enhance utilization by ensuring that resources are available when and where they are needed.

This streamlined approach reduces resource bottlenecks, minimizes idle time, and allows organizations to accomplish more with existing resources. Optimized resource utilization translates into lower project costs and improved profitability.

Increased Project Throughput: Maximizing Project Output

Ultimately, the goal of any project management methodology is to increase project throughput – the rate at which projects are successfully completed. CCM excels in this area by addressing the systemic issues that hinder project flow.

By reducing lead times, improving on-time delivery, and enhancing resource utilization, CCM creates a virtuous cycle that accelerates project completion. The focus on constraint management ensures that bottlenecks are identified and addressed proactively, preventing them from impeding the overall project flow.

The result is a significant increase in project throughput, enabling organizations to deliver more value to customers and achieve their strategic goals more effectively. Increased throughput drives revenue growth and enhances overall organizational performance.

Frequently Asked Questions About Critical Chain Management

Have questions about critical chain management and how it can improve your project success? Here are some common queries and answers:

What makes Critical Chain Management different from traditional project management?

Traditional project management focuses on individual tasks and estimates, often leading to inflated timelines. Critical chain management focuses on protecting the project timeline, rather than individual tasks. This uses buffers to absorb variations and protects the critical path and feeding buffers.

How does Critical Chain Management address the "student syndrome"?

"Student syndrome," where people delay starting tasks, is addressed by removing individual task deadlines. Instead, the focus is on starting the task as soon as resources are available and protecting the overall project end date with buffers, eliminating the pressure to artificially inflate estimates. Critical chain management encourages early starts, using available capacity efficiently.

What are the different types of buffers used in Critical Chain Management?

Critical Chain Management primarily uses project buffers, feeding buffers, and resource buffers. Project buffers protect the end date. Feeding buffers protect the critical chain from delays on non-critical paths. Resource buffers are used to ensure resources are available when needed on the critical chain.

Can Critical Chain Management be used for all types of projects?

While critical chain management is effective for a wide range of projects, it’s most beneficial for projects with high interdependence between tasks and limited resources. It is applicable to projects with a clearly defined critical path and projects that regularly run late due to resource constraints or unexpected delays.

So, that’s the gist of critical chain management! Hopefully, this helped you understand it a bit better. Go give it a shot and see how it can unlock project success for you! Cheers!